Winston-Salem Bridge Replacement

Bridges & Structures

Municipal Bridge Replacement, City of Winston-Salem

This project involves planning, surveys, roadway, hydraulics, utility design and coordination, permitting, erosion control, structures, traffic control and pavement marking plans for the replacement of Bridge No. 86 over Salem Creek, and Bridge No. 87 over Brushy Creek on Reynolds Park Road. The bridges will be replaced in their existing locations, while traffic is maintained along an offsite detour. The replacements will need to be coordinated to maintain access to properties between the structures. This municipal project is a federally funded bridge replacement. The project is located next to the Winston-Salem State University campus, requiring coordination with an existing university parking facility. The project also involves coordination with a greenway which is next to Bridge No. 87, and extensive utility and rail conflicts.