High Point Bridge Replacement

Bridges & Structures

Replacement of Municipal Bridge No. 428 on Model Farm Road, City of High Point

This project involves surveys, roadway, hydraulics, structures, planning, erosion control, utility coordination and design, traffic control and pavement marking plans for the replacement of Bridge No. 428 over a Tributary of Richland Creek on Model Farm Road in High Point.  The bridge will be replaced in its existing location with a box culvert while traffic is maintained along an offsite detour.  This municipal project is a federally funded bridge replacement and involves coordination with various agencies including NCDOT.