Chalk Road

Roadway

Chalk Road CEI, Town of Wake Forest

WEI prepared design plans, and performed construction engineering inspection for the relocation of 2,000 LF of Chalk Road.  The construction inspection involved sewer, subgrade soils, earthwork, drainage, erosion control, traffic control, pavement base, asphalt, concrete and asphalt testing, and daily reporting.  WEI acted as the on-site representative for the Town of Wake Forest.  This project required extensive utility coordination and also coordination with another contractor for an adjacent NCDOT Bridge project.  This project was completed under budget.