Butner Hospital Campus

Civil / Site Design

NC Department of Health and Human Services 2008 Civil Open-End Contract

WEI performed a computer simulation of the entire Butner Hospital campus in Granville County which entailed 56 buildings and totaled 900,000 square feet.  The study determined the improvements needed to alleviate low water pressure issues.  The modeling was completed in two months, and WEI then designed the recommended improvements which included an 830 GPM booster pump station.  WEI also performed construction engineering inspection of the designed improvements.