We Design Your Tomorrow
Wetherill Engineering Company The_Team Services Projects Contact_Us

Construction Engineering Inspection Projects



Pine Knoll Shores Bridge Replacement
WEI's full time on site construction inspector served as the Town's representative to perform Quality Control/Quality Assurance throughout the construction of the 120-foot bridge over McNeil's Creek.
Because of it's location in an environmentally sensitive area, removal of the existing bridge had to be accomplished without blasting, and there could be no construction debris discarded in the water.

Lexington Bridge Replacement
Construction inspection for the box culvert and approaches.

US-74
Asheville, NC
Inspection for the widening of US 74.

NCDOT District 7
Inspection services for the Resident Engineer in Reidsville.  Projects including inspection of a new approximate 700-foot bridge over the Dan River and interim inspections on other bridges in the area.

Deep River Bridge
New bridge, approaches & a box culvert for the Piedmont Triad Water Authority.

NCDOT Division 11
On call services to the District Engineer.  Several projects in the Elkin area including joint maintenance on I-77 and grading, drainage, pavement and erosion control on multiple projects.

Created and Maintained by WSI.